RECLAMATION COST ESTIMATE <br />According to Rule 4.2.4(1) the bond must be at least <br />$2,500.00 per acres or fraction there of. For the 12.00 acres in <br />this permit it will be $30,000. The following Reclamation Cost <br />Estimate in based on the assumption that there will be no more <br />that 12.00 acre + disturbed at anyone time and that 3.03 acres of <br />the twelve are currently disturbed and needs no reclamation, <br />other then grading. It also assumes, that when it comes time to <br />resoil the area, an average of 4 inches of soil would be spread <br />over the newly disturbed area. At that time we will have to <br />respread 4;250 cubic yards of topsoil. Some cut/fill sloping <br />will be necessary on the working face that will be no longer then <br />400 feet long and an average of 10 feet high. The time when it <br />would be most expensive to reclaim the site is when resoiling and <br />seeding is needed and mining has ended. The difference between <br />resoiling and reseeding area is in the 1.07 acres in the setbacks <br />the only need seeding. The table below outlines the various <br />sizes of disturbed areas as explained above. The areas needing <br />work in this analysis are shown on the Reclamation Map -Map Exhibit E-2. <br />A dozer will be used to do the resoiling and a motor grader will <br />be used to shape the site after resoiling is complete. <br />STAGE <br />TOTAL SOIL DEPTH <br />NEEDING REBOILING <br />7.90 AC 4 <br />REVEGETATION AREA <br />13.97 AC <br />HIGHWALL LENGTH <br />400 FT. <br />CUT/FILL VOLUME PER LINEAR FOOT <br />1. 1 6 CY/LF <br />SECONDARY REVEGETATION RATE <br />33% <br />RESOIL @ 4° a,ZSO CU81C YARDS <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Grading, and shaping area <br />144-G motor grader 2.11 act hr . . . . . . . . . $ 81.37/ac. <br />2. Re -spreading soil and/or growth media with <br />DBR dozer push distance 200 ft or less . . . . . . . $ 0.637/YD3 <br />3. Cut/fill sloping with <br />DSR dozer push distance 50 ft or less . . . . . . . $ 0.199,{YD3 <br />4. Revegetation costs includes grass seed, mulch and <br />labor . . . . . . . . . . . . . . . . . . . $600.00/ac <br />5. Weed control, spraying. . . . . . . . . . . . $200.0c./ac <br />RECLAMATION COSTS <br />1. <br />Grading, andshaping 10.93 ac. @ $81.37/ac. <br />2. <br />Resoiling, 4,250 yd x 1.12 @ 63.7�/yd <br />3. <br />Cut Fill grading 465.0 yd3x <br />1.12 @19.9G/yd <br />4. <br />Revegetation cost 8.97 ac. @ <br />$600.00/ac. <br />5. <br />Secondary revegetation cost <br />8.97 ac. *33% <br />6. <br />Seed Control 12.0 acres @ $200.00/ <br />ac. <br />Net Total <br />6. <br />Indirect costs <br />Mobilization 18 mile haul <br />from Walsenburg <br />Insurance, Bond, & Profit <br />Administration costs <br />TOTAL <br />ESTIMATE <br />SUGGEST BOND BE SET A T $30,000.00 <br />19 <br />$ 889.37 <br />3,034.17 <br />103.74 <br />5,382.00 <br />$600.00Z4L876.06 <br />2,400.00 <br />$13,585.34 <br />1,246.57 <br />1,836.74 <br />771.10 <br />$17,439.75 <br />