Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> April 2017 Monthly Report <br /> Page 3 <br /> Table 2—April 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth (ft) Volume of <br /> (feet) Water(ft) <br /> P 10 4/30/17 57.56 58.30 0.74 <br /> PH 4/30/17 41.39 41.80 0.41 <br /> P12 4/30/17 41.68 41.71 0.03 <br /> P 13 4/30/17 41.00 41.34 0.34 <br /> P14 4/30/17 41.21 41.24 0.03 <br /> P 15 4/30/17 40.88 41.10 0.22 <br /> Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br /> Table 3 - Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> Sincerely, <br /> Ov <br /> J lio F. Madrid <br /> S . Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />