Laserfiche WebLink
Cost Estimate for Reclamation <br /> The estimated area in the PVRE Pit#1 that would require seeding is 2.4 acres. That is the area <br /> which is a 25 foot permimeter around the entire pit, plus 14 feet of 2:1 slope to the edge of the pond. <br /> There is 0-5"of topsoil at the site. Assuming a pond,the banks will be sloped 2:1 and seeded. The topsoil would bf <br /> re-applied to the permimeter and the slope into the pond. We would attempt to start a cover crop on the <br /> 25 foot perimeter and the slope extening down to the pond edge. After the cover crop is established, <br /> the grass will be planted as recommended by the Natural Resource Conservation Service. <br /> The cost units below already include labor and fuel. The cover crop and grass seeding costs were obtained <br /> from the Natural Resource Cosnervation Service and habe been based on Conservation Reserve Program costs. <br /> The other unit costs were obtained from a local contractor who is <br /> equipped to perform reclamation if PYRE were to default on the reclamation plan. <br /> PVRE Pit#1 <br /> Task Volumes Units Unit Cost Item Cost <br /> Backfill and Grade 16.7 Hours $115.00 $1,920.50 <br /> Replace Topsoil/Overburden <br /> Tractor/Speedy Mover 47 Hours $75.00 $3,525.00 <br /> Revegetate Site <br /> Cover crop 2.4 Acres $45.00 $108.00 <br /> Grass seeding 2.4 Acres $45.00 $108.00 <br /> Seed 35.2 Lbs. $10.75 $378.40 <br /> (2.4 acres x 14.67#PLS/Acre) <br /> Mobilization <br /> Tractor/Speedy Mover 1 Hours $75.00 $75.00 <br /> Dozer 1 Hours $115.00 $115.00 <br /> TOTAL $6,229.90 <br /> �y� C <br />