My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-09_PERMIT FILE - M2000144
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2000144
>
2017-05-09_PERMIT FILE - M2000144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 2:07:13 PM
Creation date
5/12/2017 2:00:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000144
IBM Index Class Name
Permit File
Doc Date
5/9/2017
Doc Name
Completeness Response
From
Civil Resources, LLC
To
DRMS
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Import Material: <br />Bestway Concrete & Aggregates may import material from and export material to other <br />sites. The applicant is aware that in accordance with Rule 3.1.5(9) of the Construction <br />Material Rules and Regulations, if any offsite material is used as backfill, a notarized <br />letter will be submitted to the Division indicating the materials are inert. The applicant <br />will supply such a letter to the Division if, at the time of Reclamation, the applicant <br />intends to use off-site material as backfill. <br />(b) Earthmoving; <br />Topsoil and overburden will be stripped with scrapers or bulldozers and stockpiled in <br />segregated piles at the edge of the active mine. Excavators, front-end loaders, and <br />bulldozers will be used to excavate the material. Conveyor belts or haul trucks will be <br />utilized to transport the raw material from the active mine phase to the processing <br />area. The site will be mined at a 1HAV slope. <br />(c) All water diversions and impoundments; and <br />The perimeter of the mined area will be dewatered by digging a trench to bedrock. <br />The water will be pumped into a settling pond and discharged in accordance with a <br />CDPS permit. Wash water for the processing area will be recycled through a series of <br />small ponds within the processing area. The water required to operate the facility will <br />likely be provided by the existing water rights associated with the property. No ditches <br />will be disturbed without prior authorization of the appropriate ditch company. <br />(d) The size of area(s) to be worked at any one time. <br />The entire 19.7 acres will be worked at one time. <br />(e) An approximate timetable to describe the mining operation. The timetable is for <br />the purpose of establishing the relationship between mining and reclamation <br />during the different phases of a mining operation. <br />The Operator anticipates that mining will commence as soon as all permits are in <br />place. The Operator anticipates extracting approximately 500,000 tons of aggregate <br />per year, however, production rate may vary based on market demands. <br />Timetable for Mining and Reclamation <br />Mining will begin as one phase and take approximately one to two years. Reclamation <br />will take another year to complete. <br />Reclamation will begin immediately after mining is complete. When possible, <br />concurrent reclamation practices will be used to minimize site disturbance and to limit <br />material handling to the greatest extent possible. Please refer to the Mining Plan Map <br />in Exhibit C for phase areas to be mined, locations and areas. <br />Bestway Concrete & Aggregates —Lee Amendment -N. La Poudre Mine — MLRB 112 Permit Application <br />Exhibit D - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.