Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 91 of 161 <br />-Equipment <br />20'X20'X10' <br />Bldg. (SN) <br />2,000.00 <br />CF <br />$0.19 <br />$378.00 <br />Removal <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />-Pad <br />20'X20'X2' <br />Pavement, <br />27.00 <br />CY <br />$124.50 <br />$3,361.50 <br />concrete, <br />demolition only, <br />7 in. to 24 in. <br />thick - <br />Reinforced <br />Refuse <br />32'X17.5'X6' <br />Bldg. (SN) <br />3,360.00 <br />CF <br />$0.19 <br />$635.04 <br />Substation <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB <br />1.00 <br />EA <br />$2,505.00 <br />$2,505.00 <br />Transformer <br />Transformer <br />Removal <br />Plant <br />32'X17.5'X6' <br />Bldg. (SN) <br />3,360.00 <br />CF <br />$0.19 <br />$635.04 <br />Substation <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB <br />1.00 <br />EA <br />$2,505.00 <br />$2,505.00 <br />Transformer <br />Transformer <br />Removal <br />East Portal <br />32'X17.5'X6' <br />Bldg. (SN) <br />3,360.00 <br />CF <br />$0.19 <br />$635.04 <br />Substation <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB <br />1.00 <br />EA <br />$2,505.00 <br />$2,505.00 <br />Transformer <br />Transformer <br />Removal <br />Thickener <br />15'DX12' <br />Bldg. (SN) <br />2,120.00 <br />CF <br />$0.19 <br />$400.68 <br />Substation <br />demo./on-site <br />disposal in <br />existing pit or <br />cut - Max. <br />10,000 ft. haul <br />-Pad <br />15'DX12" <br />Demo. and on- <br />176.70 <br />SF <br />$2.22 <br />$392.27 <br />site disposal in <br />existing pit, 12 <br />in. thick - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB <br />1.00 <br />EA <br />$2,505.00 <br />$2,505.00 <br />Transformer <br />Transformer <br />Removal <br />Electric House <br />9'X9'X10' <br />Bldg. (SN) <br />810.00 <br />CF <br />$0.19 <br />$153.09 <br />demo./on-site <br />disposal in <br />existing it or <br />CIRCES Cost Estimating Software <br />