Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.530 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 70 of 161 <br />0.500 <br />Minutes <br />0.530 <br />Minutes <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return,) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Travel <br />(%) <br />(%) <br />(fpm) <br />Time <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 3000.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />1.946 <br />Haul Time: 1.946 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />114.90 <br />LCY/Hour Adjusted for job efficiency: <br />95.37 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />3000.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />1.064 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 1.064 <br />minutes <br />Total Truck Cycle Time: 4.940 <br />minutes <br />Loading Tool unit <br />Production <br />551.07 <br />LCY/Hour Adjusted for job efficiency: <br />457.39 LCY/Hour <br />Truck Unit Production <br />114.90 <br />LCY/Hour Adjusted for job efficiency: <br />95.37 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 286.10 <br />LCY/Hour <br />Adjusted single truck/loader team production: 286.10 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 286.10 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.40 <br />Hours <br />Unit cost: <br />$3.405 <br />/LCY Total job cost: $1,362 <br />CIRCES Cost Estimating Software <br />