Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.40 Minutes <br />0.60 Minutes <br />Page 57 of 161 <br />Site Altitude: 7500 feet <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Total Res Velocity <br />% 00m) <br />Altitude Ad': <br />1.000 <br />1.000 <br />(CAT HB) <br />3.00 <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />645.18 <br />LCY/Hour <br />Net Correction: <br />0.830 <br />0.830 <br />Optimal Number of Scrapers per push dozer: <br />Travel Time: <br />JOB TIME AND COST <br />Road Condition: <br />Firm, smooth, rolling, <br />dirt/it. surfaced, watered, maintained 3.0 <br />Hours <br />Unit cost: $1.551 /LCY Total job cost: <br />i nid Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res Velocity <br />% 00m) <br />Travel Time <br />(min) <br />1 <br />2300.00 <br />0.00 <br />3.00 <br />3.00 2824 <br />1.00 <br />Haul Time: 1.00 minutes <br />Return Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res Total Res <br />Velocity <br />f m <br />Travel Time <br />(min) <br />1 <br />2300.00 <br />0.00 <br />3.00 3.00 <br />2874 <br />0.91 <br />Return Time: <br />0.91 <br />minutes <br />Total Scraper team cycle time: <br />2.91 <br />minutes <br />Adjusted for job conditions: <br />322.59 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />645.18 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />645.18 <br />LCY/Hour <br />Unadjusted unit production/hour: 388.66 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />0.93 <br />Hours <br />Unit cost: $1.551 /LCY Total job cost: <br />$930 <br />CIRCES Cost Estimating Software <br />