Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.40 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Page 51 of 161 <br />Site Altitude: 7500 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Hnid Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />5.00 <br />3.00 8.00 <br />1381 <br />0.20 <br />Haul Time: 0.20 minutes <br />1?Ptnrn R -t- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.10 <br />Return Time: <br />0.10 <br />minutes <br />Total Scraper team cycle time: <br />1.30 <br />minutes <br />Adjusted for job conditions: <br />722.10 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,444.20 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,444.20 <br />LCY/Hour <br />Unadjusted unit production/hour: 870.00 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $0.694 /LCY Total job cost: <br />0.90 Hours <br />$902 <br />CIRCES Cost Estimating Software <br />