Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.40 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 (CAT HB <br />Job Efficiencv: 0.830 0.830 (CAT HB) <br />Page 49 of 161 <br />Site Altitude: 7500 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/it. surfaced, watered, maintained 3.0 <br />Wan] Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(f0m) <br />Travel Time <br />(min) <br />1 <br />700.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.56 <br />Haul Time: 0.56 minutes <br />Retnrn Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />700.00 <br />-5.00 3.00 <br />-2.00 <br />2938 <br />0.30 <br />Return Time: <br />0.30 <br />minutes <br />Total Scraper team cycle time: <br />1.86 <br />minutes <br />Adjusted for job conditions: <br />504.69 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,009.39 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,009.39 <br />LCY/Hour <br />Unadjusted unit production/hour: 608.06 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />0.30 Hours <br />Unit cost: $0.981 /LCY Total job cost: $294 <br />CIRCES Cost Estimating Software <br />