Laserfiche WebLink
Page 2 of 161 <br />681 <br />685 <br />686 <br />687 <br />688 <br />689 <br />690 <br />695 <br />700 <br />701 <br />702 <br />703 <br />704 <br />706 <br />733 <br />734 <br />738 <br />741 <br />747 <br />750 <br />751 <br />753 <br />759 <br />760 <br />761 <br />762 <br />764 <br />765 <br />766 <br />772 <br />773 <br />774 <br />790 <br />791 <br />792 <br />793 <br />795 <br />Re lace Topsoil to Bates Portal Face -Up SCRAPERI <br />1 <br />1 <br />l <br />1 <br />l <br />1 <br />1 <br />1 <br />1 <br />3 <br />3 <br />2 <br />1 <br />1 <br />3 <br />1 <br />1 <br />3 <br />1 <br />1 <br />3 <br />1 <br />1 <br />3 <br />1 <br />l <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 1 <br />3.01 <br />$3,009.00 <br />$80,889.00 <br />$8,461.00 <br />$25,357.00 <br />$4,689.00 <br />$2,252.00 <br />$18,973.00 <br />$1,704,612.05 <br />$100,050.88 <br />$715.00 <br />$696.00 <br />$19,400.00 <br />$75,207.49 <br />$89,022.00 <br />$1,032.00 <br />$3,892.00 <br />$56.00 <br />$1,380.00 <br />$932.00 <br />$71,712.15 <br />$6,555.00 <br />$4,990.00 <br />$52.00 <br />$345.00 <br />$2,105.00 <br />$67,383.00 <br />$1,220.00 <br />$8,483.00 <br />$718.96 <br />$21,731.94 <br />$33,228.00 <br />$156,130.00 <br />$12,061.00 <br />$1,703.00 <br />$1,524.00 <br />$3,985.00 <br />$28,688.12 <br />Reseed Facilities Area with Rangeland Mix REVEGE <br />178.00 <br />Reseed Disturbed Areas with Riparian Habitat REVEGE <br />21.14 <br />Reseed RDA and Transplants Shrubs REVEGE <br />95.25 <br />Reseed DWP with Rangeland Mix REVEGE <br />11.24 <br />Plant 6 Shrub Clumps REVEGE <br />5.60 <br />Weed Control - Assume 1/4 of Area Three Times REVEGE <br />102.71 <br />Demolish and Remove All Structures DEMOLISH <br />1,009.00 <br />Seal Portals and Vent Shafts MINESEAL <br />270.00 <br />Backfill East Portal Face DOZER <br />0.93 <br />Backfill West Portal Face DOZER <br />0.93 <br />Backfill Bates Portal Face DOZER <br />38.69 <br />Plug and Seal All Boreholes and Monitoring Wells BOREHOLE <br />73.00 <br />Clean Ponds 004, 007, and 008 Twice During TRUCK] <br />Liability Period <br />121.05 <br />Regrade Areas from MR -99, MR -107, MR -111, DOZER <br />MR -114 <br />1.43 <br />Seed Rangeland Seed Mix on MR Areas REVEGE <br />2.22 <br />Re lace Topsoil on D26 Extension DOZER <br />0.24 <br />Backfill and Regrade DWDA Expansion DOZER <br />1.79 <br />Replace Topsoil on Six Drill Pads and Mud Pits DOZER <br />3.88 <br />Demolish and Remove Structures DEMOLISH <br />24.00 <br />Ripand Regrade C&W Train Shop Area DOZER <br />8.49 <br />Reseed C&W Facilities Area with Rangeland Mix REVEGE <br />12.00 <br />Re laceTo soil to Zig Zag Road EXCAVATE <br />0.48 <br />Rip Zig Zag Road and Slurry Line Road RIPPER <br />0.44 <br />Reseed Zig Zag with Ran land Mix REVEGE <br />1.60 <br />Re lace Topsoil to West DWDA SCRAPERI <br />67.00 <br />Finish Grade West DWDA Area GRADER <br />8.35 <br />Reseed West DWDA Expansion Area with REVEGE <br />Rangeland Mix <br />20.40 <br />Removal of Culverts. West DWDA DEMOLISH <br />4.00 <br />Seal Additional Wells BOREHOLE <br />36.00 <br />Site Maintenance During the 10 -Year Lability SITEMAINT <br />Period ENANCE <br />400.00 <br />Import Topsoil for RDA TRUCK] <br />18.47 <br />Mobilize/Demobilize Equipment for Initial MOBILIZE <br />Reclamation <br />5.00 <br />Mobilize/Demobilize Equipment for Pond MOBILIZE <br />Cleaning <br />5.00 <br />Mobilize/Demobilize Equipment for Pond MOBILIZE <br />Removal <br />5.00 <br />Mobilize/Demobilize Equipment for Site MOBILIZE <br />Maintenance <br />3.90 <br />Demolish MR -113 Structures DEMOLISH <br />48.00 <br />SUBTOTALS: <br />3380.19 <br />$3,187,114 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $64,379.70 <br />Performance bond: 1.05 Total = $33,464.70 <br />CIRCES Cost Estimating Software <br />