Laserfiche WebLink
Page 30 of 161 <br />BULLDOZER WORK <br />Task description: Regrade Pond 004 <br />Site: New Elk Mine Permit Action: 2016 Midterm Review Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 643 State: Colorado <br />Date: 8/2/2016 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />$97.48 <br />Operating Cost/Hour: <br />$103.60 <br />Ripper own. <br />$10.74 <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />$6.60 <br />Operator Cost/Hour: <br />$38.89 <br />Total unit Cost/Hour: $257.31 <br />Total Fleet Cost/Hour: $257.31 <br />Utilization % <br />NA <br />100 <br />NA <br />100 <br />NA <br />MATERIAL QUANTITIES <br />Initial Volume: 3,840 <br />Swell factor: 1.125 <br />Loose volume: 4,320 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: _ <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push 5% <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description <br />125 feet <br />1,055.6 LCY/hr <br />7,500 feet <br />2.132 lbs/LCY <br />User Provided <br />fill or embankment 0.9 <br />Abbreviation: None <br />Filename: CO 12-643 <br />CIRCES Cost Estimating Software <br />