Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT Page 122 of 161 <br />Operator Skill: <br />0.900 <br />(AB.AVG. <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />1.119 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.6642 <br />Adjusted unit 1,401.79 LCY/hr <br />production: <br />Adjusted fleet 1401.79 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.171/LCY <br />Total job time: 0.24 Hours <br />Total job cost: $56 <br />CIRCES Cost Estimating Software <br />