Laserfiche WebLink
Page 116 of 161 <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.270 Minutes Adjusted for site altitude: 1.270 Minutes <br />Truck Maneuver and Dump 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 1" tire <br />penetration 4.0 <br />Haul Route - <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />5.00 <br />4.00 <br />9.00 <br />1249 <br />4.024 <br />Haul Time <br />Return Route: <br />4.024 <br />minutes <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />5000.00 <br />-5.00 <br />4.00 <br />-1.00 <br />2938 <br />1.754 <br />Loading Tool unit <br />Production 298.78 <br />Truck Unit Production <br />Optimal No. of Trucks: 5 <br />Return Time: 1.754 <br />Total Truck Cycle Time: 8.348 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 157.74 <br />Adjusted single truck/loader team production: 157.74 <br />Adjusted multiple truck/loader team production: 157.74 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $4.662 /LCY <br />_ minutes <br />minutes <br />247.99 LCY/Hour <br />52.58 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 121.05 Hours <br />Total job cost: $89,022 <br />C[RCES Cost Estimating Software <br />