Laserfiche WebLink
Page 111 of 161 <br />-Plug <br />PVC plug - 4 in. <br />4" <br />NA <br />3.00 <br />EA <br />$29.34 <br />$88.02 <br />diameter borehole <br />-Cut Casings <br />Exposed casing <br />4" <br />NA <br />4.00 <br />LF <br />$1.76 <br />$7.04 <br />at Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />-Borehole <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$3.47 <br />$10.41 <br />Markers <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig <br />SCHRAMM <br />NA <br />NA <br />18.00 <br />EA <br />$230.31 <br />$4,145.58 <br />Time <br />T450BH <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />18.00 <br />EA <br />$56.19 <br />$1,011.42 <br />Time <br />Gal. <br />RW1 & SWI <br />Portland cement <br />4" <br />161 LF <br />7.00 <br />bag <br />$11.00 <br />$77.00 <br />- SW6 Fill <br />grout ( Bag, material <br />w/Cement <br />cost only ...94 lb. bag) <br />-Plug <br />PVC plug - 4 in. <br />4" <br />NA <br />7.00 <br />EA <br />$29.34 <br />$205.38 <br />diameter borehole <br />-Cut Casing <br />Exposed casing <br />4" <br />NA <br />4.00 <br />LF <br />$1.76 <br />$7.04 <br />at Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />-Borehole <br />Borehole <br />NA <br />NA <br />7.00 <br />EA <br />$3.47 <br />$24.29 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig <br />SCHRAMM <br />NA <br />NA <br />14.00 <br />EA <br />$230.31 <br />$3,224.34 <br />Time <br />T450BH <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />14.00 <br />EA <br />$56.19 <br />$786.66 <br />Time <br />Gal. <br />Dewatering <br />Portland cement <br />4" <br />450 <br />19.00 <br />bag <br />$11.00 <br />$209.00 <br />Holes Fill <br />grout ( Bag, material <br />w/Cement <br />cost only ...94 lb. bag) <br />-Plug <br />PVC plug - 4 in. <br />4" <br />NA <br />2.00 <br />EA <br />$29.34 <br />$58.68 <br />diameter borehole <br />-Cut Casing <br />Exposed casing <br />4" <br />NA <br />4.00 <br />LF <br />$1.76 <br />$7.04 <br />at Surface <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />-Borehole <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$3.47 <br />$6.94 <br />Marker <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig <br />SCHRAMM <br />NA <br />NA <br />10.00 <br />EA <br />$230.31 <br />$2,303.10 <br />Time <br />T450BH <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />10.00 <br />EA <br />$56.19 <br />$561.90 <br />Time <br />Gal. <br />Seal 3 Slurry <br />Portland cement <br />9" <br />1350 <br />298.00 <br />bag <br />$11.00 <br />$3,278.00 <br />wells ( <br />grout ( Bag, material <br />MR95) <br />cost only ...94 lb. bag) <br />-Drill rig and <br />Atlas Capco <br />NA <br />NA <br />12.00 <br />EA <br />$243.17 <br />$2,918.04 <br />labor <br />DM45/HP - 9.0" <br />-Water Truck <br />Water Tanker, 2,500 <br />na <br />na <br />12.00 <br />EA <br />$56.19 <br />$674.28 <br />time <br />Gal. <br />-slurry well <br />PVC plug - 8 in. <br />9" <br />NA <br />3.00 <br />EA <br />$72.66 <br />$217.98 <br />plugs <br />diameter borehole <br />CIRCES Cost Estimating Software <br />