My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-02_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-02_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 8:42:22 AM
Creation date
5/12/2017 10:26:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/2/2017
Section_Exhibit Name
Exhibit 28 Reclamation Bond Calculation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.530 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Page 8of161 <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Adjusted for site altitude: <br />0.530 <br />Minutes <br />Adjusted for site altitude: <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/it. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production 551.07 <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 405.43 <br />min <br />1 <br />1500.00 4.00 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />Haul Time: 0.989 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Production 551.07 <br />(Ft) <br />Truck Unit Production <br />M <br />(%) (fpm) <br />Time <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 405.43 <br />min <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 2938 <br />0.567 <br />_ minutes <br />minutes <br />457.39 LCY/Hour <br />135.14 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 48.56 Hours <br />Unit cost: $2.434 /LCY Total job cost: $47,920 <br />CIRCES Cost Estimating Software <br />Return Time: 0.567 <br />Total Truck Cycle Time: 3.486 <br />Loading Tool unit <br />Production 551.07 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />162.82 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 405.43 <br />Adjusted single truck/loader team production: 405.43 <br />Adjusted multiple truck/loader team production: 405.43 <br />JOB TIME AND COST <br />_ minutes <br />minutes <br />457.39 LCY/Hour <br />135.14 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 48.56 Hours <br />Unit cost: $2.434 /LCY Total job cost: $47,920 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.