My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-11_INSPECTION - M1998024
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1998024
>
2017-05-11_INSPECTION - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 12:14:22 PM
Creation date
5/12/2017 9:01:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
INSPECTION
Doc Date
5/11/2017
Doc Name
Inspection Report
From
Oldcastle SW Group
To
DRMS
Inspection Date
4/11/2017
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#02A Pagel of 2 <br /> BULLDOZER WORK <br /> Task description: Highwall reduction <br /> Site: Hidden Valley Gravel Pit Permit Action: SI-03 Permit/Job#: M1998024 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 4/17/2017 County: Eagle Filename: 02a <br /> User: THM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: OBSOLETE-Cat D8T-8U <br /> Horsepower: 305 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $52.86 NA <br /> Operating Cost/Hour: $68.35 100 <br /> Ripper own. Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.85 NA <br /> Total unit Cost/Hour: $163.06 <br /> Total Fleet Cost/Hour: $163.06 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 19,097 <br /> Swell factor: 1.124 <br /> Loose volume: 21,457 LCY <br /> Source of estimated volume: Onsite observations/cut and fill <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,627.0 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -15 % <br /> Average site altitude: 6,350 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.