Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#02A Pagel of 2 <br /> BULLDOZER WORK <br /> Task description: Highwall reduction <br /> Site: Hidden Valley Gravel Pit Permit Action: SI-03 Permit/Job#: M1998024 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 4/17/2017 County: Eagle Filename: 02a <br /> User: THM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: OBSOLETE-Cat D8T-8U <br /> Horsepower: 305 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $52.86 NA <br /> Operating Cost/Hour: $68.35 100 <br /> Ripper own. Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.85 NA <br /> Total unit Cost/Hour: $163.06 <br /> Total Fleet Cost/Hour: $163.06 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 19,097 <br /> Swell factor: 1.124 <br /> Loose volume: 21,457 LCY <br /> Source of estimated volume: Onsite observations/cut and fill <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,627.0 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -15 % <br /> Average site altitude: 6,350 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />