My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-10_REPORT - M2003030
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2003030
>
2017-05-10_REPORT - M2003030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 11:53:17 AM
Creation date
5/12/2017 9:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
REPORT
Doc Date
5/10/2017
Doc Name
Annual Fee/Report/Map
From
Joseph Dorris
To
DRMS
Annual Report Year
2016
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A total of 2.91 acres has been reclaimed since this operation began in 2003.No additional sites were <br /> reclaimed during 2016 since mining was limited to Sites C and D. <br /> Reclamation Accomplished During2 016: <br /> No reclamation was accomplished during 2016. Berms were reinforced around the open dig sites <br /> and along access roads. The site was broken down and fenced to make safe for the winter. <br /> On 24May, we planted 60 aspen, 30 waxcurrant, and 30 ponderosa on sites C and B. At this time <br /> sufficient trees and shrubs have been planted on previously disturbed areas. Additional trees and <br /> shrubs will be planted after final reclamation on Sites D and C. Some soil piles were reseeded with <br /> native grasses. <br /> Tree and bush survival rate is about 85 percent. Some trees are over four feet in height. Regrowth <br /> continues to be slow but is considered 80 percent revegetated. <br /> Roads have not been removed. They provide access for Sites A and C that are still being mined or <br /> maintained. <br /> All other sites under this permit except Site C and Site D which are open for operations are at 80 <br /> percent regrowth and considered complete. <br /> Proposed 2017 Operations: <br /> Mechanized operations will be in conjunction with operations on T. D. Mining claims, Quist claims <br /> and Crystaljack claims from early June through early August. Operations will primarily use a John <br /> Deer 992 and/Or 350 track hoe. Operations on the Smoky Hawk will extend Site C to the north <br /> boundary. We will again drill and blast at site C to develop some deeper pegmatites. Site D will be <br /> worked to the extent of its permit boundary and reclaimed, recontoured, and reseeded. <br /> Site visits, including mineral extraction, reclamation, and claim maintenance will be continued <br /> throughout the season. <br /> Anticipated 2017 Disturbances: <br /> Approximately 0.4 acre will be opened on the Smoky Hawk at Site C and D. Approximately 0.4 <br /> acre will be reclaimed and reseeded. <br /> If time permits,the prospect at Site K will be opened and reclaimed. <br /> Proposed 2017 Reclamation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.