Laserfiche WebLink
TABLE 19-1 <br /> Projected Reclamation Schedule <br /> Seneca II-W Mine <br /> Year Acres Disturbed Acres Reclaimed Net Disturbed/ <br /> Unreclaimed Acres <br /> 1989-2007 1,291.5 1,200.3 91.2 <br /> 2008-2012 0.0 80.7 10.5 <br /> Totals 1,291.5 1,281.0 10.5 <br /> Notes: Includes permanent roads and facilities within Mine Area only <br /> Tie-Across Haulroad area(96.6 acres) is not included in the figures above <br />