My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-09_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2017-05-09_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 7:36:49 AM
Creation date
5/10/2017 6:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
5/9/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
TR72
Email Name
RDZ
JRS
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 13 <br />COST SUMMARY WORK <br />Task description: Cost S ummary for IR -72 <br />Site: New Elk Mine Permit Action: Technical Revision 72 Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task#: A00 <br />Date: 5/9/2017 <br />Us er: CCW <br />State: Colorado <br />County: Las Animas <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: None <br />Filename: C012 -A00 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />A01 <br />A02 <br />A03 <br />A04 <br />Replace Topsoil on NW vent Fan Area TRUCK1 <br />1 <br />1 <br />1 <br />1 <br />5.95 <br />$1,915.00 <br />$468.00 <br />$1,999.00 <br />$2,948.00 <br />Regrade Access Road to NW Vent Shaft DOZER <br />2.33 <br />Seed NW Vent Fan and Access Road REVEGE <br />1.55 <br />Mobilize Equipment forNW Vent Shaft MOBILIZE <br />Reclamation <br />3.50 <br />SUBTOTALS: <br />13.33 <br />$7,330 <br />INDIRECT COSTS <br />CAILIVA00soICEOW."MDiu :Z6]ato <br />Liability insurance: <br />2.02 <br />Total= <br />$148.07 <br />Performance bond: <br />1.05 <br />Total= <br />$76.97 <br />Job superintendent: <br />6.66 <br />Total= <br />$486.51 <br />Profit: <br />10.00 <br />Total= <br />$733.00 <br />TOTALO & P = <br />$1,444.55 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$9,698.51 <br />CONTRACT AMOUNT (direct + 0 &P) = <br />$8,774.55 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total= <br />0.00 <br />Engineering work and/orcontract/bid preparation: <br />5.23 <br />Total= <br />$458.91 <br />Reclamation management and/or administration: <br />5.30 <br />$465.05 <br />CONTINGENCY: <br />0.00 <br />Total= <br />$0.00 <br />TOTALINDIRECT COST= <br />$2,368.51 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$9,698.51 <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.