Laserfiche WebLink
Page 13 of 13 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />TRINIDAD <br />Total one-way travel distance: <br />25.00 miles <br />Average Travel Speed: <br />40.00 mph <br />TotalNon-Roadable Mob/Demob Cost * <br />`* <br />$2,835.95 <br />two round trips with haul rig: <br />0.25 <br />Total Roadable Mob/Demob Cost ** <br />$111.66 <br />* * one round trip, no haul rig: <br />1.25 <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Haul Time (Hours): <br />0.63 0.63 <br />Return Time (Hours): <br />0.63 <br />0.63 <br />Loading Time (Hours): <br />0.25 <br />NA <br />Unloading Time (Hours): <br />0.25 <br />NA <br />Subtotals: <br />1.75 <br />1.25 <br />JOB TIME AND COST <br />Totaljob time <br />3.50 Hours <br />Totaljob cost: $2,948 <br />CIRCES Cost Estimating So$ware <br />