Exhibit E — Reclamation Plan <br />structures, and for the use and development of on-site water resources. Since the <br />area of surrounding lands is a mix of these uses, the site end use will retain these <br />potentials. <br />The rate of reclamation activity, including grading, soiling and revegetation will <br />follow concurrently with extraction and the respective timetables identified for <br />extraction under Exhibit D — Mining Plan. All timetables are contingent upon <br />market conditions. With extraction activities anticipated to take up to 25-30 years <br />to complete, reclamation will add an approximately five years to this estimate, <br />bringing the anticipated life of the mine to 25-30± years, or the year 2045-50. The <br />actual end point is five (5.0f) years subsequent to the completion of all recoverable <br />materials and successful release of all reclamation required under the approved <br />State of Colorado Division of Reclamation Mining and Safety (DRMS) permit. <br />A Backfill Notice follows this page, as part of this Exhibit. The use of inert fill <br />will facilitate the timely fill of selected portions of the project areas, and related <br />reclamation of affected lands and use of related water resources (refer to Exhibit L <br />— Reclamation Costs). <br />Varra Companies, Inc. OMLR 112 Permit Application 4 <br />Parcel 122 — Resource Development Project 20 April 2017 <br />