Laserfiche WebLink
Mi AGPROfessionals <br /> DIVELOPEPR , OVAGRIC.i LITRI. <br /> Exhibit D — Reclamation Plan <br /> In the event the mining operation is terminated and no soil is being removed, the following <br /> Reclamation Plan will be implemented within one year of final termination. <br /> D-1 Topsoil Segregation and Stockpiling <br /> Topsoil was not stockpiled prior to excavation for future reclamation use. Topsoil will be re- <br /> established through farming techniques such as tilling to break up the soil and introducing a soil <br /> amendment such as compost to establish a proper seed bed during the reclamation process. <br /> D-2 Reclamation Site Grading <br /> Final grading will be such that the topography is appropriate to the reclaimed use of the property, <br /> i.e. rangeland. As required, the maximum gradient will not exceed 3H: IV and final grading will <br /> achieve geotechnical stability. Ground water is not anticipated to be encountered during mining. <br /> D-3 Re-vegetation <br /> The pre-mining vegetation at the site consists of sparse native grassland. At the end of mining <br /> the disturbed areas will be re-vegetated. The re-vegetated area will be approximately 9 acres. <br /> Vegetation will be reclaimed using a native seed mixture on disturbed areas. Topsoil will be re- <br /> established through farming techniques such as tilling to break up the soil and introducing a soil <br /> amendment such as compost to establish a proper seed bed during the reclamation process. <br /> Subsoil, as exposed from construction and mining, can support good stands of grass provided <br /> adequate fertilizers are supplied and given proper protection(mulching) from erosion. Existing <br /> soil and compost material will be tilled to a depth of 6 inches to provide an adequate surface for <br /> seeding. <br /> The seedbed shall be firm and free of weeds and other non-desirable vegetation. In areas where <br /> there is excessive compaction, tillage, such as chiseling and disking, shall be done to break up <br /> the compaction then harrowed down. <br /> Dormant planting will occur anytime after October 15`h or when temperatures are cold enough to <br /> prevent seed germination. Seeding on frozen soils will be avoided. Planting may also be done in <br /> the spring until the end of April or early May and between July 1 and September 1 S`. Planting <br /> will be done with a grass drill. The recommended reclamation seeding mix provided in Table 1 <br /> was provided by the Eastern Colorado NRCS range specialist for sandy soils. Seeds will be <br /> drilled as described below or equivalent manufacturer's recommendation. <br /> ENGINEERING, PLANNING, CONSULTING & REAL ESTATE <br /> 3050 671h Avenue■Suite 200■Greeley,CO 80634 <br /> www.agl2ros.com/office■ 970.535.9318/fax■ 970.535.9854 <br />