Laserfiche WebLink
Page 6 of 8 <br />PR8 Letter to Robin Reilley <br />May 3, 2017 <br />Section 2.3 of the permit document has been updated to include information on the PR -7 Mine <br />Expansion Area vegetation study. A new section, Section 2.3.6, has been added with specific <br />information on the study along with an addition to Appendix D which contains the detailed <br />vegetation study results. Section 2.3.6 would insert pages 2-122a through 2-122p in the permit <br />document. New Map 48A has been included to show the vegetation for the PR -7 Mine Expansion <br />Area based on the vegetation mapping and sampling completed in 2014. <br />g) An updated operations, reclamation and mitigation of impacts plan for the new mining and <br />reclamation activities required by Rule 2.06. <br />At this time, no mining is planned in the PR -7 area. Any planned activities for this area will be <br />described in a mining and reclamation plan to be submitted and approved prior to mining in the <br />PR -7 Mine Expansion Area. <br />h) Information to address the requirements for permits for special categories of mining, if <br />applicable, required by Rule 2.06. <br />At this time, no mining is planned within the PR -7 area. Any requirements for permits for special <br />categories of mining will be described in a mining and reclamation plan to be submitted and <br />approved prior to mining in the PR -7 Mine Expansion Area. <br />Proposed PR -7 Expansion Area pond construction. While not a direct response to any particular <br />stipulation outlined above, enclosed is construction information for several ponds within the PR -7 <br />expansion area to be built following approval of this PR. Sediment ponds will be constructed in <br />Deacon, Jeffway and Deal Gulches to capture sediment from future mining disturbance in those <br />drainages. <br />The location of proposed sediment ponds Deal #2, Deacon #1 and #2, and Jeffway #1 and #2 are <br />given on enclosed Map M51, Drainage and Sediment Control. Summary information for each of <br />these ponds is found in Table 4.8-6 (pages 4-185, 4-186 and 4-186a). Design information is <br />summarized in Table 4.8-7 (pages 4-189, 4-190 and 4-190a). Please note that there is missing <br />information on Table 4.8-7. Work is currently underway to provide the missing design <br />information and will be presented in a forthcoming revision. Diversion ditch information for Deal <br />#2 Pond is included in Table 4.8-3 (page 4-177). Map M52 is enclosed to add proposed NPDES <br />sites for Deacon (site 025), Deal (site 026) and Jeffway (site 027) Gulches. Spring sites are also <br />updated in revised Map M52. Hydrologic model information is added to Appendix Q for Deacon <br />Gulch (Section XXXVIII), Deal Gulch (Section XXXIX) and Jeffway Gulch (Section XXXX). <br />This response also includes the following enclosures: <br />Replacement or New Pages <br />Table of Contents Pages i-3, i-4, i-5, ii -4, ii -5, iii -5, iii -6, iii -7, iii -8, iv -2 and iv -4 (added/edited <br />text) <br />Pages 2-122a through 2-122p (added text including Table 2.3-25) <br />Page 2-181through 2-182 (added/edited text including Table 2.5-5) <br />Pages 2-345a through 2-345w (added text including Tables 2.6-7 through 2.6-11) <br />