My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-05_REPORT - M1984008
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984008
>
2017-05-05_REPORT - M1984008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 4:20:43 AM
Creation date
5/8/2017 9:16:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984008
IBM Index Class Name
REPORT
Doc Date
5/5/2017
Doc Name
Annual Fee/Report/Map
From
Continental Materials Corp.
To
DRMS
Annual Report Year
2017
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page d of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: < 1 Q seeded w/ 12.6 w/topsoil mulched w.1 <br /> a proved infix: --replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: <1 Q fertilizedw/ 0 replacement N/A rate(tonslac): N/A <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application Broadcast application N/A application N/A <br /> method: method: method: <br /> 13_ Is weed control being conducted in accordance with an approved Weed Control Plan? (Zoi NO N/A <br /> If"YES",indicate die weed species,control area,control throe.application rate and treatment date on the report map. <br /> Russian olive and salt cedar, physical removal, fall/s rinp. <br /> 14. is adequate topsoil reserved I&reclamation,based on your approved pe it' � NO N/A <br /> If"NO",please explain• <br /> 15. is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? S NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? (0 NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO ®/ <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? GS NO N/A <br /> 19. Is your basis for legal right to enter still valid? ES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES ® N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-1 16 or 34-32.5-1 16),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreagzs Specified in items 7-12 and 14. UPDATED <br /> MAP ATTACIIED: YES <br /> 41Pa ,, e <br />
The URL can be used to link to this page
Your browser does not support the video tag.