My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-08_PERMIT FILE - M2017007
>
Day Forward
>
Permit File
>
Minerals
>
M2017007
>
2017-05-08_PERMIT FILE - M2017007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 6:47:36 AM
Creation date
5/8/2017 9:15:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017007
IBM Index Class Name
PERMIT FILE
Doc Date
5/8/2017
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Environment, Inc.
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C O L O R A D O John W.Hickenlooper <br /> Governor <br /> Division of Water Resources <br /> AV I <br /> I Depart r<.rt of Na:ura Resources Robert Randall <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Application Consideration <br /> DATE: March 27, 2017 <br /> TO: (Eric Scott, E ironmental Protection Specialist M <br /> CC: Division 2 Office; District 79 Water Commissioner OMsio O <br /> p Rs <br /> FROM: Caleb Foy, P.E. M�NNO4S.gFk4 Al/0 <br /> �y N <br /> RE: Perrino Pit, File No. M-2017-007 <br /> Operator: Colorado Crushing, Inc. <br /> Contact: Steve O'Brian, (303) 423-7297 <br /> Sec. 2, Twp. 27S, Rng. 68W, 61h P.M., Huerfano County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br /> ground water must not occur during or after mining operations. If stormwater is contained <br /> on-site, it must infiltrate into the ground or be released to the natural stream system <br /> within 72 hours, or all work must cease until a substitute water supply plan, or <br /> augmentation plan approved by water court, is obtained. Reclamation plans must ensure <br /> water will not be retained onsite for more than 72 hours unless an augmentation plan <br /> approved by water court is obtained. <br /> ® The proposed operation will consume water by: ❑ evaporation, ® dust control, ❑ <br /> reclamation, ❑ water removed in the mined product, ® processing, ❑ other:. <br /> ® All water used on-site for mining needs shall be a legal supply of water provided by an <br /> appropriate supplier. The applicant shall confirm the legality of any proposes source of <br /> water supply with the Division of Water Resources prior to use in the operation. <br /> COMMENTS: The local Water Commissioner, Lenna Rauber, may be contacted at (719) 568-0489 or <br /> lenna.rauberCstate.co.us regarding legal supplies of water in the area. <br /> .OF rp�U <br /> Office of the State Engineer <br /> 1313 Sherman Street,Room 821,Denver,CO 80203 P 303.866.3581 <br /> www.water.state.co.us <br /> Is!C=. <br />
The URL can be used to link to this page
Your browser does not support the video tag.