My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-03_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-05-03_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:33 PM
Creation date
5/4/2017 8:46:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
5/3/2017
Doc Name
Completeness Notice
From
DRMS
To
Various
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legal Description <br /> Exhibit A <br /> 6.4.10) Affected Land <br /> The May Day Idaho Mine Complex permit boundary is comprised of 274.7 acres of which 56 <br /> acres are affected directly or indirectly by proposed mining activities. The township and range <br /> pennit boundary is located in Section 21 and Section 28,T36N,RI I W,N.M.P.M. <br /> The main entrance to the May Day Idalio Mine Complex Universal Transverse Mercator(UTM) <br /> Grid as determined by the United State Geological Survey (USGS) is 575797 413661. <br /> The May Day Idaho Mine Complex includes the following affected lands: <br /> May Day No. 1, May Day No. 1 East, May Day No. 2,May Day No. 3, Idalio Mill site and <br /> Payday Mill site(collectively, the "Idaho Affected Area"or"Pay Day Idaho Affected <br /> Area"),the Chief Tunnel, La Plata Bridge, Base of Operations,Pre-Existing Roads, the New <br /> Access Road,and designated buffer zones within the identified permit boundary(Figure <br /> C-1). <br /> Sunrise Mining, LLC (Sunrise) has acquired or leased the following legal descriptions for these <br /> affected areas: <br /> May Day No. 1: a tract of land located in Section 28, T36N, RI I W,N.M.P.M. and being <br /> more particularly described as follows: beginning at a point from which the WI/4 corner <br /> of said Section 28 bears S 70°58'59"W a distance of 3268.40 feet,Thence,N 33°15'W a <br /> distance of 300.0 feet, Thence N 56°45 E a distance of 500.0 feet,Thence S 3395'E a <br /> distance of 300.0 feet,Thence S 56°45'W a distance of 500.0 feet, to the point of <br /> beginning and containing 3.5 acres. <br /> May Day No. 1 East: May Day No. 1 East is illustrated on Figure C-4 and will be used <br /> to store Run of Mine rock from the May Day No. 1. The total affected lands including <br /> buffer is 0.5 acres. <br /> May Day No. 2: a tract of land located in Section 28, T36N, R I 1 W, N.M.P.M., and <br /> being more particularly described as follows: beginning at a point from which the WI/4 <br /> corner of said Section 28 bears S 82°30'1 VW a distance of 2299. 7 feet, Thence,N a <br /> distance of 380 feet,Thence E a distance of 380 feet,Thence South a distance of 380 <br /> Sunrise Mining,LLC <br /> May Day Idaho Mine Complex <br /> 112d Permit Application-1981-185 AM 02 <br /> April 17,2017 <br /> Exhibit A—Rule 6.4.1 Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.