Laserfiche WebLink
April 26, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 8 of 8 <br /> <br /> <br />Photo 5 : The bottom portion of the section that was being repaired on Gob Pile #4. The plastic <br />pipe was diverting runoff from the erosional area to a ditch further down the gob pile . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />