Laserfiche WebLink
M1 <br /> 33. Aug::entation water available for irrigation shall be <br /> the balance of the allowable augmentation water for <br /> irrigation after deducting the Miller Pit allocation and <br /> stream transportation charges. Beginning the first full <br /> year of retering the Torn of Elizabeth's wastewater <br /> effluent, the allowable augmentation water for irrigation in <br /> the following irrigation season shall be determined fro^.1 the <br /> previous year's annual wastewater efflt.Pnt fcom the Town of <br /> Elizabeth. <br /> 34. Allowable pu:;;page from the lfunt W,^ll No. 1 for <br /> irrigation shall be determined by r•iltiplying the "allowable <br /> avgrentaticn water" by 1.43. <br /> 35. Monthly records of the totalizing peter readings for <br /> the Town of Elizabeth's wastewater effluent and Kunt Well <br /> 11o. I ;hall be recorded and provided to the Division <br /> Engineer for Water Division. No. 1 or the designated <br /> representative on an annual basis or ul-Dn request by the <br /> Division Engineer in a fo:r, approved by the Division <br /> Engineer. <br /> 36. Applicant acknowledges tnat trere is only sufficier* <br /> water as defined in paragraph B.2 and quantified in <br /> paragraph 6 to provide replacements for the depletions <br /> associated with Lute niuiny operation and irrigation or bu <br /> acres. Therefore, if the axounts of nontributary <br /> groundwater de:feed herein are in an insufficient quantity <br /> to replace depletions for the total operation proposed under <br /> this plan for augmentation, Applicant will obtain water fron <br /> anotker source, line the pond or fill in the pond with <br /> onsite backfill materials, if Applicant adds sources Of <br /> replacement water, Applicant trust file an application with <br /> the Water Court seeking approval of an additional source or <br /> sources for replacement of depletions. ire Court retains <br /> jurisdiction Fursuant to paragraph 36 to assure the <br /> continued replacement of depletions. Further, the Court <br /> :-ctains jurisdiction for five years after mining operations <br /> have ceased to ensure that the pond is either lined, filled <br /> in or that the water designated as the replacement source in <br /> this decree is adequate, or an alternative water supply of <br /> augmentation is secured to replace evaporative depletions if <br /> necessary. <br /> 37. Applicant agrees that the requirements of this decree <br /> shall run with the land and be recorded in the real estate <br /> records of Elbert County, Colorado. <br /> 14 <br />