My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-28_REVISION - M1977094
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977094
>
2017-04-28_REVISION - M1977094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:29 PM
Creation date
5/2/2017 9:34:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977094
IBM Index Class Name
Revision
Doc Date
4/28/2017
Doc Name
Adequacy Review Response
From
RPM, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) The Operator shall establish reasonable timetables consistent with good <br />mining and reclamation Procedures: <br />We believe the mining and reclamation phases (timetable) discussed above will reduce the <br />potential for the reclaimed areas being re -disturbed. <br />(5) All refuse and acid-forming or toxic producing materials that have been <br />mined shall be handled and disposed of in a manner that will control unsightliness <br />and protect the drainage system from pollution: <br />No refuse, toxic or hazardous materials are to be disposed at the site. <br />(6) Any drill or auger holes that are part of the mining operation shall be <br />plugged in accordance with methods approved by the Division: <br />There are no drill or auger holes which are part of the mining operation. There are no adits <br />or shafts associated with this mining operation. <br />(7) Maximum slopes and slope combination shall be compatible with the <br />configuration of the surrounding conditions and the selected post mining land use: <br />The proposed post mining land use will be rangeland. The final interior pit slopes will be <br />3H:1 V which are suitable for use by all classes of livestock. The slopes leading away from <br />the created bench on the downhill sides of the operation will be natural slopes, likewise <br />suitable for all classes of livestock. <br />No highwalls will be left. Any rock areas will be dozed and ripped to eliminate highwalls <br />and then graded to a 314:1 V final reclaimed slope. <br />(8) If the Operator's choice of reclamation is for agricultural or horticultural <br />crops which normally require the use of farm equipment, the Operator shall grade so <br />that the area can be traversed with farm machinery. <br />The post mining land use will be rangeland. No lands within the amended permit boundary <br />will be reclaimed to agricultural or horticultural uses. <br />(9) Placement of inert structural fill imported from off-site: <br />(a) A narrative that describes the approximate location of the proposed activity; <br />At this time, importing inert structural fill is not anticipated. <br />(b) the approximate volume of the inert material to be backfilled; <br />NA <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.