Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2016 Annual Hydrology Report D34-13 <br />Dove Gulch - Drainage System <br />Elevation - 6440 <br />Initiated 10/31/1997 10/31/1997 10/31/1997 <br />Activated <br />Date 1 10/24/2016 9/8/2016 6/24/2016 <br />Summary Information <br />Field <br />Parameters <br />Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow <br />GPM 0.00 0.00 0.00 0 0 0 <br />FieldComment <br />Dry Dry Dry <br />ph <br />su <br />Conductivity <br />umhos/cm <br />Temperature <br />Celsius <br />Lab <br />Parameters <br />UNITS <br />Bicarbonate <br />mg/L <br />Chloride <br />mg/L <br />Conductivity <br />umhos/cm <br />Hardness <br />mg/L <br />Nitrate -Nitrite <br />mg/L <br />Oil and Grease <br />mg/L <br />pH <br />su <br />Phosphate <br />mg/L <br />ResidueFilterable-TDS <br />mg/L <br />ResidueNonFilterable-TSS mg/L <br />SAR <br />Sulfate <br />mg/L <br />Aluminum <br />mg/L <br />Arsenic <br />mg/L <br />Cadmium <br />mg/L <br />Calcium <br />mg/L <br />Copper <br />mg/L <br />Iron (Total) <br />mg/L <br />Lead <br />mg/L <br />Magnesium <br />mg/L <br />Manganese (Total) <br />mg/L <br />Mercury <br />mg/L <br />Molyebdenum <br />mg/L <br />Selenium <br />mg/L <br />Sodium <br />mg/L <br />Zinc <br />mg/L <br />The area of concern for monitoring point D34-13 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />The location for D34-13 is at the lower extreme of Dove Gulch, along the western edge of Hubbard Creek Trail. <br />Baseline Information Collection initiated on 10/31/97 and not yet considered complete. <br />Point D34-13 has not been influenced by mining. <br />Figure 65 <br />