Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2016 Annual Hydrology Report <br />S5-2 <br />Powerline Seep - Spring 5-2 <br />Elevation - 7200 <br />Initiated <br />Activated <br />Date <br />10/29/2012 10/29/2012 10/29/2012 10/29/2012 <br />1 <br />11/7/2016 9/21/2016 6/29/2016 5/31/2016 <br />Summary Information <br />Field <br />Parameters <br />UNITS <br />Min <br />Baseline <br />Ave <br />Operation <br />Max Min Ave Max <br />Flow <br />GPM <br />0.34 <br />0.34 <br />0.34 Dry Dry Damp Damp <br />Temperature <br />Celsius <br />9.2 <br />9.2 <br />9.2 <br />Conductivity <br />umhos/cm <br />850 <br />850 <br />850 <br />pH <br />su <br />7.6 <br />7.6 <br />7.6 <br />Field Comments <br />Lab <br />The area of concern for monitoring point S5-2 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />Surface Water <br />Figure 41 <br />