Laserfiche WebLink
April 11, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 5 of 6 <br /> <br />PHOTOGRAPHS <br /> <br /> <br />Photo 1: Gob Pile #3. The gob on pile #3 is placed in windrows to help drain the water from the <br />material before it is spread and compacted. There were no issues noted at Gob Pile #3. <br /> <br /> <br />Photo 2: Gob Piles #1 (bottom left of the photo), #2 (right side of the photo) and #4 (left-center <br />of the photo). <br />