My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-28_REPORT - C1981038 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2017-04-28_REPORT - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 10:22:43 AM
Creation date
5/1/2017 8:04:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
4/28/2017
Doc Name
Annual Hydrology Report
From
JE Stover & Associates, Inc.
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Hydrology Report
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Production and Geologic Conditions <br />The Bowie No. 1 Mine suspended operations during December, 1997 and remained idle <br />throughout the calendar year. The mine has been reclaimed. <br />Operation Unit Descriptions <br />Bowie No. 1 Mine has no operating units to report on during the calendar year. <br />Subsidence Impacts - 2016 <br />With the approval of technical revision number 25, no subsidence monitoring stations <br />were surveyed during the year. <br />Wide -Spaced Monitoring Grid Station Summary <br />Through technical revision number 45, the DRMS approved a reduction in subsidence <br />monitoring. The wide spaced subsidence monuments, Sites 6, 14, 15, 16, DH 55, DH <br />65, DH 66, DH 68, 81, 82, 83 and 95 were not monitored during the year. <br />Pitkin Mesa Pipeline <br />Seven subsidence monitoring stations were established at locations along the Pitkin <br />Mesa Pipeline which overlies Panel C. Panel C development commenced in October <br />with twenty-four crosscuts completed by January 1, 1993. Panel C was mined utilizing <br />a partial extraction design intended to preclude the development of subsidence in order <br />to protect the pipeline. The subsidence monitoring stations along the pipeline are <br />depicted on Map No. 2-5. Though technical revision number 57, the DRMS approved <br />the cessation of subsidence monitoring of the seven (7) Pitkin Mesa Pipeline monitoring <br />locations. These monitoring stations (PL -01 through PL -07) were last surveyed during <br />2013. <br />Visual Monitoring 2016 <br />Visual subsidence monitoring is accomplished by periodic "walkovers" of recently mined <br />areas within the present permit area. During the 2016 monitoring season, visual <br />monitoring consisted of visual inspections done while water monitoring. <br />Visual monitoring is concentrated over areas of retreat mining with particular emphasis <br />on areas mined under low overburden. Since the mine has now been idled in excess of <br />10 years, there are no areas of particular emphasis on which to concentrate visual <br />inspections. <br />Projected Subsidence Impacts - 2017 <br />Subsidence impacts during 2017 are projected to be minimal based upon subsidence <br />patterns established to date. No mining is currently projected for 2017. <br />Projected Subsidence Monitoring — 2017 <br />No subsidence monitoring will be performed in 2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.