My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-28_REPORT - C1981038 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2017-04-28_REPORT - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 10:22:43 AM
Creation date
5/1/2017 8:04:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
4/28/2017
Doc Name
Annual Hydrology Report
From
JE Stover & Associates, Inc.
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Hydrology Report
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />According to Stipulation No. 29, Permit No. C-1981-038, the operator submits the following <br />Annual Mine Inflow Report for the period of July 1, 2015 through June 30, 2016. <br />Mining Locations and Projections <br />Mining operations at Bowie No. 1 Mine have ceased due to market conditions and coal quality <br />issues. It is highly unlikely mining operations will resume since the surface facilities have been <br />reclaimed. <br />Mine Inflow <br />The underground Mine Inflow Study at the Bowie No. 1 Mine was not conducted during 2016, as <br />the mine was inactive and inaccessible. <br />No water was discharged from the mine to the surface during the 2015-2016 reporting period. <br />The operator has no plans to discharge water from within the mine to the surface during the <br />2016-2017 reporting period. No water has been discharged from the mine to date. <br />Water Importation and Balance <br />There was no production of coal from the Bowie No. 1 Mine from July 1, 2015 through June 30, <br />2016. Production estimates for the following twelve-month period remain at zero. Historically, <br />mine water importation is estimated from recorded flows and the number on tons mined. With <br />no coal production to base water usage upon, the operator submits only evaporative loss from <br />ponds for the consumptive use during the water year. Evaporative loss is based upon the <br />assumption that all of the ponds have full dead pool storage during the entire reporting period. <br />These water quantities are listed as: <br />Dust Suppression on Bowie No. 1 Roadway........................................................................... 0.00 <br />Bathhouse Consumption'........................................................................................................0.00 <br />Evaporative Loss from Ponds.................................................................................................. 4.60 <br />SiloUsage................................................................................................................................0.00 <br />Total water usage 4.60 <br />Hydrologic Impacts <br />Historically, there was virtually no water inflow into the mine. Therefore, the hydrologic impact <br />caused by the mining operation is either non-existent or not measurable. <br />Conclusions <br />No mine discharge and no importation of water is anticipated during the 2016 - 2017 reporting <br />period. Therefore, the quality and quantity of surface water adjacent to the mine will not be <br />affected. The operator will continue to submit the Annual Subsidence and Hydrology Report <br />which will summarize all subsidence and hydrology data. <br />'Bathhouse has been dismantled. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.