Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 1 Mine <br />2016 Annual Hydrology Report <br />Field <br />Parameters 1UNITS <br />SM10 <br />Monitoring Well SM -10 <br />Depth - 48.7' <br />Elevation - 7250.47 <br />Initiated 8/8/1986 <br />Activated <br />Date 6/14/2016 <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Static Water Level <br />Feet <br />36.2 <br />43.7 <br />50.0 <br />45.48 <br />Water Elevation <br />Feet <br />7200.5 7206.8 7214.2 <br />7204.99 <br />Temperature <br />Celsius <br />6 <br />10.6 <br />22.4 <br />10.8 <br />Conductivity <br />umhos/cm <br />1800 <br />2662 <br />4370 <br />1800 <br />pH <br />su <br />6.4 <br />7.2 <br />11.1 <br />7.4 <br />Field Comments <br />2013 <br />Acidity <br />mg/L <br />6 <br />56 <br />Lab <br />Parameters <br />UNITS <br />Bicarbonate <br />mg/L <br />91.54 <br />822 <br />1179 <br />Carbonate <br />mg/L <br /><MDL <br /><MDL <br /><MDL <br />Chloride <br />mg/L <br />21.8 <br />85 <br />285 <br />1 1 <br />Conductivity <br />umhos/cm <br />1553.9 <br />2775 <br />3740 <br />Hardness <br />mg/L <br />213.3 <br />1151 <br />2013 <br />Acidity <br />mg/L <br />6 <br />56 <br />104 <br />pH <br />su <br />6.8 <br />7.3 <br />8.4 <br />ResidueFilterable-TDS <br />mg/L <br />1244 <br />2239 <br />3578 <br />ResidueNonFilterable-TSS mg/L <br />30 <br />928 <br />4590 <br />SAR <br />0.45 <br />3.92 <br />9.70 <br />Sulfate <br />mg/L <br />349.13 <br />900 <br />1679 <br />Calcium (Dissolved) <br />mg/L <br />18.5 <br />171 <br />341 <br />Iron (Dissolved) <br />mg/L <br />0.02 <br />0.06 <br />0.16 <br />Iron (Total) <br />mg/L <br />0.16 <br />4.30 <br />13.82 <br />Magnesium (Dissolved) <br />mg/L <br />8.2 <br />177 <br />287 <br />Manganese (Total) <br />mg/L <br /><MDL <br />0.23 <br />0.58 <br />Sodium (Dissolved) <br />mg/L <br />18 <br />308 <br />899 <br />TDS Ratio (aray./calc.) <br />% <br />0.90 <br />1.01 <br />1.12 <br />The area of concern for monitoring point SM10 has not been affected by the mining operation. Therefore, <br />monitoring events are considered Baseline. <br />`Not enough water for field parameters or sample <br />Shallow monitoring wells SM -1 through SM -11 were constructed in 1985 in order to gather additional infort <br />on alluvial/colluvial deposits within the permit boundary. They are depicted on Map 4-1. <br />Baseline Information Collection initiated on 8/8/86 and not yet considered complete. <br />Point SM10 has not been influenced by mining. <br />Ground Water <br />