My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-28_REVISION - M1990140
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990140
>
2017-04-28_REVISION - M1990140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 5:11:07 PM
Creation date
4/28/2017 1:04:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990140
IBM Index Class Name
Revision
Doc Date
4/28/2017
Doc Name
Decision letter
From
DRMS
To
Duran & Pearce Contractors
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 02A Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Reduce slopes to 3H:1V <br />Site: Martin Pit 1-A Permit Action: CN-1 AM Permit/Job#: M1990140 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado Abbreviation: None <br />Date: 4/28/2017 County: Moffat Filename: M140-02a <br />User: ACY <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $83.81 NA <br />Operating Cost/Hour: $66.17 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $191.83 <br />Total Fleet Cost/Hour: $191.83 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 1,000 <br />Swell factor: 1.125 <br />Loose volume: 1,125 LCY <br />Source of estimated volume: Backfill 100lft 1:1 to 3:1 15’ D Exhibit D <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 852.6 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push gradient: 0 % <br />Average site altitude: 6,500 feet <br /> <br />Material weight: 2,550 lbs/LCY <br /> <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.)
The URL can be used to link to this page
Your browser does not support the video tag.