Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # 05A Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Distribute topsoil <br />Site: Martin Pit 1-A Permit Action: CN-1 AM Permit/Job#: M1990140 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado Abbreviation: None <br />Date: 4/28/2017 County: Moffat Filename: M-140-005a <br />User: ACY <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $83.81 NA <br />Operating Cost/Hour: $66.17 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $191.83 <br />Total Fleet Cost/Hour: $191.83 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 10,648 <br />Swell factor: 1.215 <br />Loose volume: 12,937 LCY <br />Source of estimated volume: Exhibit E- 8” topsoil over 9.9 ac max <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 852.6 LCY/hr <br /> <br />Materials consistency description: Partly consolidated stockpile 1.1 <br /> <br />Average push gradient: 0 % <br />Average site altitude: 6,500 feet <br /> <br />Material weight: 1,600 lbs/LCY <br /> <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.)