Laserfiche WebLink
Kilgore Companies Elam Construction LeGrand Johnson Construction <br /> 7057 West 2100 South 556 Struthers Ave, 4910 Old Airport Road <br /> \, • Salt Lake City,Utah �j, Lif I+< Grand Junction,Colorado a Moab,Utah <br /> (, 84128 81501 84532 <br /> Colorado Division of Reclamation <br /> Stephanie Mitchell RECEIVED Mining&safety <br /> Colorado Division of Reclamation, Mining and Safety Attention: Minerals Program <br /> Grand Junction Field Office, APB 2 7 1313 Sherman Street, Room 215 <br /> 101 South 3Td Street, Room 301 2017 Denver,Colorado 80203 <br /> Grand Junction Ql DMSIaN ,_ <br /> RE: M-1979-089 (23 Ro d Pit) Inspection to Abatement- Compliance with Mine Plan <br /> Dear Mrs. Mitchell: <br /> Enclosed please find the Technical Rev No. 7 (TR-7) and check in the amount of$216 for the <br /> processing fee for this TR-7. As part of the -7 e d are the updated maps for Exhibits C and F. <br /> The mining plan map (Exhibit C) shows the implemented irrigation pipe for the as-built configuration <br /> and elevations of its two (2) outfalls. Also Exhibit C shows the intended excavation limits with the <br /> revision for the intention to mine the existing peninsula/island. This location stems from the western <br /> property line and was originally intended to remain to account for the existing bundle cottonwood trees. <br /> However, these cottonwood trees 20-30 years later are now dying or falling over from high winds. The <br /> proposed method would be to excavate the gravel underneath these trees, then once the gravel is <br /> depleted from this location the reclamation process will commence for construction of the <br /> peninsula/island. We will backfill and plant new cottonwood trees, and/or other suitable vegetation as <br /> well as drill seed and crimp mulch the approved seed mix to reflect the new proposed contours as it is <br /> represented in Exhibit F. At this time Elam feels we have met compliance with the mine plan and <br /> existing activities and kindly request approval of this TR-7 and abatement to the problem noted in the <br /> inspection report dated April 10, 2017 for the inspection that occurred on March, 15, 2017. <br /> Thank you for your assistance during this process. Please call me if you have any questions. <br /> Best Regards, <br /> Jon Mueller <br /> Environmental Compliance Coordinator <br /> Kilgore Companies dba Elam Construction, Legrand Johnson Construction, Peak Materials <br /> Phone: 970-242-5370 <br /> Email:ion.mueller(a,elamconstruction.com <br />