Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation Cost U-date <br /> Site: - Fedinec Pit Permit Action: 2012 March Review PermigJob#: M 1977057 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4 5 2012 County. Moffat Filename: M67-000 <br /> ----------- --------- <br /> User: - <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> Ola Mobilize reclamation crew and equi ment MOBILIZE 1 2.93 $2,941.31 <br /> 02a Reduce upper bench to a 3H:1 V slope and rough DOZER 1 1.96 $391.16 <br /> finish grade <br /> 03a Reduce lower bench to a 3H:I V slope and rough DOZER I 0.63 $126.26 <br /> finish grade <br /> 04a Rip benches RIPPER 1 6.06 $1,292.00 <br /> 05a Distribute topsoil over disturbed areas LOADER 1 20.99 $2,954.00 <br /> 06a Spread topsoil DOZER 1 6.09 $1,217.83 <br /> 07a Reve etate affected area REVEGE 1 5.00 $5,879.63 <br /> SUBTOTALS: 43.66 $14,802.19 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $299.00 <br /> Performance bond: 1.05 Total $155A2 <br /> - ----------- --- - --- --- <br /> Job superintendent: 27.59 Total _ $1,636.09 <br /> Profit: 10.00 Total $1,480.22 <br /> - -- ---------------- -------- --- <br /> TOTAL O&P = $3,570.73 <br /> CONTRACT AMOUNT(direct+O&P) _ $18,372.92 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total $0.00 <br /> Reclamation management and/or administration: 5.00 $918.65 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $4,489.38 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $19,300 <br />