My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-25_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2017-04-25_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:20 PM
Creation date
4/25/2017 4:22:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
4/25/2017
Doc Name
Request for Technical Revision
From
Brian Bloess
To
DRMS
Type & Sequence
TR9
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />' . 13 13 Sherman Street, R, ? i S, lacraver, Colorado 84243 ph(343) 866-3567 <br />QUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 0 i Site Name: American Gypsum Eagle -Gypsum Mine <br />County Eagle County <br />TR# DRUS Use one <br />Permittee:American Gypsum Company, I ' <br />Operator (If Oth er than Permittee)., _ <br />ito <br />Brian Bloess complied! Permittee Representative: /o V'iolatiori5 1W rw, <br />Please provide a brief description of the proposed revision: SAFrj ' <br />Relocadw of mine haul road and construd3on of new sediment control at entrance to mine property of of County Rad 51 In Eagle Co. <br />Entrance to mine will move approximately 400' downstream and three new sedtmenl corttrokontainmenl stmctures <br />Will be Iwiil <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. if the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. Ifthe Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR: however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tyne Reauired,TR Fee Submitted (mark only one) <br />1 IOc, 111, 112 construction 171materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />I IOd, I I2d(I, 2 or 3) $I006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.