Laserfiche WebLink
Figure 1.2 — Collector Split Flange <br />Split Flange <br />4. Once the condenser tubesare in place, secure the collector frame and collector. <br />5. Mount the drainpipe on the collector if applicable. <br />6. Mount the aftercooler onto the collector. Gaskets are provided for each joint. <br />7. Mount the carbon columns onto their supports. <br />8. Install the chillerunit as per the Water ChillerGeneral Arrangement drawing. <br />9. All the piping that coulde done prior to shipping and installation has been done. It <br />is only necessary to put in the supply, drain and interconnecting piping for the <br />condenser tubes, the aftercooler, vacuum pumps,carbon columns, and water chilling <br />system. It is recommended that rigid pipe be used. See the Process Flow and <br />Instrumentation Diagram for the size of water supply. <br />10. Install any additional instruments that mount directly on the aftercooler or collector. <br />11. Mount the fume hood and exhaust ducting if applicable. <br />Rl