My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-13_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2017-04-13_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 12:07:31 PM
Creation date
4/24/2017 9:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/13/2017
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR90
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1.2 — Collector Split Flange <br />Split Flange <br />4. Once the condenser tubesare in place, secure the collector frame and collector. <br />5. Mount the drainpipe on the collector if applicable. <br />6. Mount the aftercooler onto the collector. Gaskets are provided for each joint. <br />7. Mount the carbon columns onto their supports. <br />8. Install the chillerunit as per the Water ChillerGeneral Arrangement drawing. <br />9. All the piping that coulde done prior to shipping and installation has been done. It <br />is only necessary to put in the supply, drain and interconnecting piping for the <br />condenser tubes, the aftercooler, vacuum pumps,carbon columns, and water chilling <br />system. It is recommended that rigid pipe be used. See the Process Flow and <br />Instrumentation Diagram for the size of water supply. <br />10. Install any additional instruments that mount directly on the aftercooler or collector. <br />11. Mount the fume hood and exhaust ducting if applicable. <br />Rl
The URL can be used to link to this page
Your browser does not support the video tag.