Laserfiche WebLink
Attached is a design plan for the new construction showing new disturbance and <br />proposed reclamation of the existing roadway. Material from the current crossing will <br />be removed and incorporated into the new haul road realignment. The slopes will be <br />reclaimed in accordance with established reclamation design criteria for the Eagle - <br />Gypsum Mine. <br />Please consider this letter American Gypsums formal request for a technical revision to <br />the Eagle Gypsum Mine's reclamation plan. Feel free to contact me with any additional <br />concerns or questions. <br />Kindest regards, <br />t <br />Brian Bloess <br />EHS/HR Manager <br />American Gypsum Eagle Plant <br />attachments <br />cc: DRMS Denver Office via fed -ex <br />American Gypsum Company - 740 Highway 6 - P.O. Box 980 • Gypsum, Colorado 81637 • p.970-524-8103 • £970-524-8140 <br />