Laserfiche WebLink
Ca <br />4 � <br />Fq <br />4 Cil ++s <br />Fav <br />COLORADO DIVISION OF RECLAMATION, MINING AND�� <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 vzo <br />nrly -e <br />REQUEST FOR TECHNICAL REVISION rTRI r0VU114MUlW nom.._ 20>7 <br />File No.: M- $y — O 4 1 <br />Site Name: American Gypsum Eagle -Gyp <br />County Eagle County TR# DBMS Use orrl <br />Permittee:American Gypsum Company, LLC. <br />Operator (If Other than Permittee): n/a TRQ9 <br />Permittee Representative: <br />Brian Bloess ✓ Complied. <br />✓0 Violations <br />Please provide a brief description of the proposed revision: <br />Relocation of mine haul road and construction of new sediment control a1 entrance to mine properly off of County Road 51 in Eagle Co, <br />Entrance to mine will move approximalely 4W downstream and three new sediment controVeontainment struclures <br />will be built <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision, <br />Permit Type Required TR Fee Submitted (mark only one) <br />1 IOc, 111], 112 construction <br />materials, and 112 quarries $216 ❑ <br />112 hard rock (not DMO) $175 ❑ <br />I IOd, 1 I2d(1, 2 or 3) $1006 ❑ <br />