Laserfiche WebLink
Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Work Performed: <br />NWCC, INC. <br />FIELD REPORT <br />Project No.: 99-3983 <br />Report No.: 83 <br />Date: <br />3/23/17 <br />Time: <br />4.0 <br />Mileage: <br />44 <br />Engr. /Tech: <br />CR <br />As requested, we visited the project site on today's date and conducted compaction test No's 551 through 553 on <br />the material being placed for the Refuse Pile. <br />Twentymile Coal Company crews placed and compacted processed waste coal in the Refuse Pile Expansion <br />Area. <br />We also obtained a sample of material and returned it to our laboratory in Steamboat Springs, CO for standard <br />checkpoint Proctor testing. The sample matched a previous Proctor (12P) for this project. <br />Remarks: <br />The material tested today generally met project specifications for compaction. <br />Please refer to attached sheet for results of today's testing. <br />Verbal Discussions: <br />Cliff Stiel of Twentymile Coal Co. was on-site during our visit. <br />