Laserfiche WebLink
CWDA No. 2 <br />#01349-0001 Huddimon-Berry <br />01/12/17 ' mei ..-p LL, <br />Discussion of Inclinometer Monitoring <br />The latest inclinometer readings indicate no major movements since the last quarterly reading. <br />In general, the 4th Quarter 2016 monitoring data does not provide any indication of instability in <br />CWDA No. 2. <br />Vibrating Wire Piezometers <br />Between 2005 and 2012, a total of ten vibrating wire piezometers were installed in CWDA No. <br />2. However, several of the piezometers have been damaged or have otherwise ceased to <br />function. Currently, five of the piezometers are functional. <br />Monitoring of the functioning piezometers was completed by DOWL on December 14th, 2016. <br />The attached monitoring report prepared by DOWL includes the piezometer monitoring data and <br />the data is summarized in the following table. <br />VWP ID <br />Initial Pore <br />Pressure <br />(psi) <br />9/26/16 Pore <br />Pressure <br />(psi) <br />12/14/16 Pore Difference Since <br />Pressure Installation <br />(psi) (psi) <br />Difference <br />Since Last <br />Reading (psi) <br />VWP-05 <br />6.8 <br />2.3 <br />2.0 -4.8 <br />-0.3 <br />VWP-06 <br />11.3 <br />14.0 <br />13.6 +2.3 <br />-0.4 <br />VWP-08 <br />8.2 <br />9.9 <br />9.9 +1.7 <br />1 0.0 <br />VWP-09 <br />2.8 <br />3.0 <br />2.8 0.0 <br />1 -0.2 <br />VWP-10 <br />-1.9 <br />-1.7 <br />-1.8 +0.1 <br />1 -0.1 <br />Discussion of Vibrating Wire Piezometers <br />i�>< <br />VWP-05 was installed on August 3, 2005 near the toe of CWDA No. 2 adjacent to the access <br />road/bench. The pore pressures recorded at VWP-05 have shown some seasonal fluctuations; <br />however, the range of pore pressure changes is fairly small. In general, HBET does not believe <br />that the pore pressures in VWP-05 are cause for concern regarding stability of the gob pile. <br />VWP-06 <br />VWP-06 was installed on June 5, 2009 near the existing top of CWDA No. 2. The pore <br />pressures recorded at VWP-06 have fluctuated since installation. In general, the fluctuations <br />have been seasonal and reflect the level of coal mine waste placement activity on top of CWDA <br />No. 2. Although an increase was recorded in the 1St Quarter 2016, the pore pressures recorded in <br />VWP-06 have decreased since then. In general, HBET does not believe that the measured pore <br />pressures are an indication of any instability in CWDA No. 2. <br />VWP-08 <br />VWP-08 was installed on June 5, 2009 at a slightly lower elevation than VWP-06. The pore <br />pressures recorded at VWP-08 have fluctuated since installation. However, the fluctuations have <br />generally been within a narrow range of values. The measured pore pressures are generally <br />consistent with the level of coal mine waste placement activity at CWDA No. 2. <br />As indicated in the referenced Stability Evaluation report, the stability of CWDA No. 2 is <br />sensitive to increases in pore pressures in VWP-08. An increase in the pore pressure of 7 psi in <br />VWP-08 would result in a reduction of the Factor of Safety to below 1.5. <br />X:\2008 ALL PROJECTS\01349 -Bowie Resources, LLC\01349-0001 Bowie Mine\200 - Geo\Gob 2\ Instrumentation Monitoring\2016\01349-0001 GP2 4thQ 2016 L011117.doc 2 <br />