My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-14_REPORT - M1974015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974015
>
2017-04-14_REPORT - M1974015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2020 1:24:15 AM
Creation date
4/19/2017 5:04:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974015
IBM Index Class Name
REPORT
Doc Date
4/14/2017
Doc Name
Annual Fee/Report/Map
From
Martin Marietta Materials
To
DRMS
Annual Report Year
2017
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation, since permitted mining activities began: Page 4 of 5 <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ r— w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: _ fertilized w/ -- replacement rate(tons/ac): -- <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application _ application application <br /> method: j method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO /A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P., and/or Permanent Pp p Au entat'o ? mr"eA.� rr.'..r,YES NO /A <br /> � �GYOIA�"� <br /> 17. Are all hazardous materials stored within approved s i 1 contai me t s ruct ur s YES NO XrA <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ES NO N/A <br /> 19. Is your basis for legal right to enter still valid? ES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: V/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.