Laserfiche WebLink
Table of Contents <br /> Photograph 21: Sediment Control Pond Embankment with Blue Heron <br /> Photograph 22: Drillers Set-up to Drill the RD-03 Piezometer <br /> Photograph 23: New Piezometers near the Toe of the Indian Rock Dump and Well-Established <br /> Vegetation <br /> Photograph 24: RD-03 Piezometer Looking Down on Steel Stick-up and Locking Cap and Lid <br /> Photograph 25: RD-03 Piezometer Following Completion,with the Steel Stick-up, Locking Cap and Lid, <br /> and Concrete Apron in Place <br /> Photograph 26: Indian Rock Dump In-situ Treatability Injection Pilot System using the RD-01, RD-02, <br /> and RD-03 Piezometers for Recirculation/Monitoring <br /> Photograph 27: Piping System used in Phosphate Injection Pilot Testing in the P-4/P-11 Area <br /> Photograph 28: Addition of Phosphate Reagents in the P-4/P-11 Area filled with Groundwater to be <br /> Reinjected into the Underground Mine Workings under Gravity Pressure <br /> Photograph 29: Tanks Staged in the P-5/P-12 Area for Pilot System Injections <br /> Photograph 30: 55-Gallon Drums and PVC Pipe used for Testing Uranium Removal Efficiency with <br /> Engineered Treatment Cell Solid-Phase Reagents <br /> Appendices <br /> Appendix A Slope Velocity Vector Map 2016 <br /> Appendix B Letter of Surety <br /> CD Pocket <br /> 1 PDF version of 2016 Annual Reclamation Report <br /> 2 2016 Sediment Embankment Report <br /> 3 2016 Radioactive Materials License Annual Letter Report <br /> 4 2016 Annual Geotechnical Report <br /> 5 DRMS Inspection Report, September 14, 2016 <br /> 6 Technical Revision Number 7 <br /> 7 RD Well Construction Logs <br /> 8 Additional 2017 Pilot Testing Agency Approvals: <br /> Underground Injection Control Authorization <br /> Chemical Usage Approval <br /> iii <br />