Laserfiche WebLink
Pitch Reclamation Project Colorado Mined Land Reclamation Board— 2016 Annual Reclamation Report <br /> o To facilitate larger-scale injections, up to five additional recirculation/monitoring wells will <br /> be installed in the Indian Rock Dump, and up to three additional recirculation/monitoring <br /> wells will be installed in the underground mine workings. <br /> • Installation of an in-ground,field demonstration-scale engineered treatment cell, containing <br /> zerovalent iron for the removal of uranium from surface water and shallow groundwater. If viable, <br /> full-scale engineered treatment cells will be used at strategic locations to achieve uranium load <br /> reduction while source control strategies are being implemented. <br /> • Implementation of active management strategies for removal of"treatment residuals" (particularly <br /> phosphate)from surface water, in the event that these treatment residuals are present in surface <br /> water as a result of the implementation of uranium load reduction field activities. <br /> • Performance monitoring at SW-33 and upgradient groundwater and surface water locations to <br /> evaluate the effectiveness of the 2017 field activities. <br /> 37 <br />