My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-14_REPORT - M1992066
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1992066
>
2017-04-14_REPORT - M1992066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2020 1:33:21 AM
Creation date
4/19/2017 5:01:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992066
IBM Index Class Name
REPORT
Doc Date
4/14/2017
Doc Name
Annual Fee/Report/Map
From
Duckels Construction/Yampa Aggregates
To
DRMS
Annual Report Year
2017
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� y <br /> Notes: <br /> Hogue River Pit, 62.7 Acres � <br /> � <br /> Railway R-O-W follows fence line <br /> Location of HW, RL, SH, P, R, Berm, BT Ditches, I LR & WC Sandelin <br /> and Product Stockpiles are approximate. <br /> Rail Line R-O-W Union Pacific Operations Access <br /> Excess Overburden and mine wastel will be used for HRLP <br /> I <br /> reclamation of the Bettger Pit. N4485092 <br /> Not shown in the expansion area are two abandoned E 13 336994 NAD 83 <br /> irrigation ditches crossing the area from east to west. <br /> Mining setback from the permit boundary in the <br /> expansion area will be up to 75 ft. in the area of CDOT Right of Way HW US 6 &40 <br /> the new BT, 10 ft along the west side of the pit HW <br /> and 60 ft, from the Yampa River bank or 10 ft. <br /> from the south permit boundary, which ever is <br /> greater. Union Pacific Right of Way <br /> Fence along railway R-O-W owned by RL— <br /> 4.64' R L 315.80' <br /> Union Pacific surface ditch to f-S 45'00'00"E F rN 85'49'46"E <br /> Fence on the west end of the Hogue River borrow ditch 860.34' s <br /> Pit owned by Duckels Const. Co. Office Trailer and Out Buildings, storage yard <br /> �� 458.03' 4�—N87°35'45"E L_--,�� f addressed under the original Hogue River Pit <br /> Trailer and out building at the northeast 4Tg,51' 3�N 84.3925"Ems— v application (D & D Enterprises, Inc.) <br /> corner of the existing Hogue River .09 04' <br /> Pit on Duska Family property g' <br /> 8�-N 80This portion of the BT to BT Duska Family LLC <br /> 4 13 remain until final pit <br /> addressed in the original Hogue Pit unc.,erdrain to reclamation SH P Clean Water <br /> River Pit application surface ditch Discharge to Yampa River <br /> 21 Processing 3 <br /> F g Existing Hogue River Pit ' <br /> l� <br /> Expansion Area �' New BT � BT 51 .0 Acres Area o.. <br /> 11 .7 Acres This portion of the 0 <br /> Steamboat Il Metro District (A� <br /> HRL berm will be removed <br /> during mining of the / Approx.location of well <br /> expansion area. 42066-F <br /> a Permit <br /> Hogue Ranch Limited Affected area Be7m.% °e' Product P <br /> Partnership, LLP boundary Active Pit Stockpile Boundary 0 <br /> Process water Mary C. Baker <br /> (HRLP) Z o m Area pond <br /> N Pasture o "157.s2' R <br /> 9 <br /> w a ` 10 �8=87°36'S0 W r I a� s\& <br /> Power Pole D M HRLP �— <br /> R I 218.12' `S 5.39' A ��"� <br /> 0 r� S 83°05'20"W S 75°10'25"W w`� ��tpTe <br /> 467.96' C` <br /> Berm--, s 7�°o?'C8 W /`-S 67°22'4s"w I Mary C. Baker �O �1 <br /> Yampa Valley Berm to be P / 12 R f HRLP <br /> Electric Assn. f 13 158.57' / <br /> Power Line added for S 65°33'22"W <br /> expansion 14 HRLP _ <br /> 168.89' <br /> Approx.location of S 65°55'28"W <br /> well16850-F `moo LEGEND; 0 300' <br /> �1g <br /> Power Pole Pasture `-� Rpa� 0 F Fence <br /> Mtn R River =HOGUE <br /> 20 19 P Pond �rr� - <br /> - <br /> Nearestpowerpole F — --�-- EXHIBIT C BT Berm Topsoil ER PIT MINE PLAN'MAP.TRV <br /> is approximately 100 Ft. �. 2�' Mary C.Baker SH Scale House SCALE CATE DRAWN BY <br /> from the Permit Boundary / S 89'21'48"W RL Railway Right of Way 300 Ft/In 12-8-2010 RPM. Inc <br /> PRE-MINING AND MINE PLAN MAP HW US 6 &40 <br /> JOB REVISION SHEET <br /> JOB 1/1 1!1 <br /> This map drawn with TRAVERSE PC, Software <br /> Traverse PC <br />
The URL can be used to link to this page
Your browser does not support the video tag.