Laserfiche WebLink
4 1 GCC RECEIVED <br /> Rio Grande MAR 17 2017 <br /> Pueblo Plant <br /> March 16,2017 DIVISION OF RECLAMATION <br /> MININGAND SAFETY <br /> Mr. Elliot Russell <br /> Environmental Protection Specialist <br /> Division of Reclamation and Mining Safety <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> Re: Pueblo Cement Plant and Limestone Quarry. DRMS Permit No. M-2002-004 <br /> Semi-Annual Groundwater Monitoring Report <br /> Dear Mr. O'Donnell: <br /> Pursuant to TR-03 of the referenced permit, GCC conducted water sampling on its groundwater monitoring <br /> well MW-005 on 03/16/2017 at approximately 3:20 PM. <br /> Samples were not collected from MW 005 since the well was found to be ft at that time. <br /> Should you have any questions/comments about this submission, please contact me at(719) 647-6861 or <br /> eolivares@gcc.com <br /> Sincerely <br /> Edwin Olivares <br /> Environmental Engineer <br /> GCC Rio Grande,Inc.• Pueblo Plant <br /> 3372 Lime Road•Pueblo,CO 81004 <br /> (719)647-6800•Fax(719)647-6899 <br />